View Single Post
      12-04-2014, 03:14 PM   #217
ynguldyn
Brigadier General
7576
Rep
3,423
Posts

Drives: battery powered tv on wheels
Join Date: Jun 2010
Location: Boston

iTrader: (0)

Quote:
Originally Posted by M3111Z View Post
This says that production of the new F48 X1 begins July 2015. Does this mean production of the current E84 model will end before then, or might BMW continue building it for a while longer? I'm asking because I'd like to do a European Delivery of an X1 in September 2015 (my current lease ends 8/22/15). I could go for either model, depending on what's available, but I don't think the new X1's will be available that soon (I've read early 2016). But if production of the E84 ends before July, would they still be available for ED in Sept.? I hope BMW wouldn't allow a period when neither is available.
Wouldn't it make more sense to do ED in June, if your lease is up in August? With September ED, you'd need another vehicle to bridge the gap between ED pickup and US side redelivery.

And yes, this appears to be the last year for E84.
Appreciate 0