Quote:
Originally Posted by BEAR-AvHistory
FYI.
My M4C was on the dock in Quality Check for a week. Was put on a ship last night.
Issue was missing RAM. Trying to find out now if it was shipped with or without a radio.
Been tracking mine pretty close - retired with to much time on my hands.
July 20 - Joined Allocation Waiting List
#3 for a convertible
August 16 - Allocation number came up
August 18 - Got Build Sheet to fill out
August 24 - Submitted Build Sheet & Deposit
September 24 - Scheduled for Production
September 30 - Production Begins
October 5 - Exterior Body Assembly Begins
October 6 - In Paint Booth
October 7 - Entering Assembly Line
October 7 - Assembly in Progress
October 8 - Quality Check
October 18 - Final Assembly
October 19 - Ready for Transport
October 19 - Awaiting Carrier Assignment
October 19 - Dispatched from Factory
October 20 - At the Port
October 27 - In Transit
We were told last week they expected it around November 17. Expect they will miss that date. Would like to see it around Thanksgiving.
|
I waited on the RAM as well. It will have a radio, the RAM is in the trunk area and the computer. If they told you they installed the RAM; then your golden. I had to wait another month for them to put one in.