Thread
:
Let's See Your House Projects!
View Single Post
11-05-2019, 03:29 PM
#
604
lsturbointeg
Lieutenant General
9153
Rep
14,522
Posts
Drives: 2011 535i Jet Black
Join Date: Aug 2014
Location: Asian lost in OH
iTrader: (
0
)
spent time over the Weekend working on the basement room. because the ceiling was removed I had to finish up some of the wall to extend to the top of the floor above using drywall. the closet I removed I finished up redoing the wall since it had to be repaired along with a nice round corner. already sanded and applied 2nd coat of joint compound. once it's dry it'll be time to break out the hopper and apply texture. wait for that to dry than paint!
i'm gonna say i'm very pleased with the flat black ceiling and how it turned out. can't wait to continue this throughout the basement
__________________
~F90Conversion~21"3Piece Forged AvantGardeWheels~KWV1Coilovers~CQUENCE slotted/drilled rotors~GoodridgeStainlesslines~MeisterschaftQuadEx haust~Akrapovic 4"tips~VRSF DP~VRSF CP~TurboSmart BOV~K&N filter~CarbonFiberExteriorComponents~GladenAlphaCo mponents~MatchUp7BMW~Punch P300-12T~
Follow me on Instagram: lsturbointeg
Appreciate
7
IllSic_Design
2122.50
bosstones
1154.00
Hawkeye
2069.50
King Rudi
13154.00
David0ff
1056.00
hardparker
299.00
Ickdeep
5717.50
Quote
lsturbointeg
View Public Profile
Find More Posts by lsturbointeg